Kitchen 2/5/25
a day ago
The cabinets have been placed, temporary plywood is installed in place of the counter tops. Friday (2/7) the appliances will be delivered, and the company installing the countertop will measure to install it. That is built at their facility and brought here in one piece. Or so I'm told. But that will be at least a week delay in getting it done. It couldn't be done earlier because the cabinets have to be in place in order to properly measure the countertop area. The still a lot of molding and trim work to be done, that will occur after the countertop is in place.